Φ/Β συστήματα

Home
Builders

 

1.150€/m2all-inclusive price

(Excluding the cost of the building permit
and landscaping the grounds)

  • 10-year construction guarantee
  • Fixed budget
  • We give you the solution:
    • for your loan
    • installing solar on your roof
Home specifications

Contact us directly to arrange an appointment at our offices.

facebook

Cost of building work

Cost of constructing a home
"turn-key”
€ 1,150/m2 all-inclusive price

(Excluding the cost of the building permit and landscaping the grounds)

We provide you with information on all the stages you have to go through to construct a home using the turn-key method.

PHASE A

From the start of work to completion of the building's frame.

This phase includes the following work tasks:

Initial work tasks

  • Marking out the project site
  • Fencing off the plot / worksite
  • Taking out an insurance contract against third party risks
  • Obtaining approval of the building permit from the police

Earthworks

  • Excavating the foundations
  • Filling the foundations
  • Backfilling soil around the structure

Plumbing work

  • Excavating for the cesspit
  • Purchasing and installing the cesspit
  • Installing sewage pipework in the basement

Electrical works

  • Project earthing in the foundations
  • Bringing power line to the worksite
  • Lighting box (spotlights on balconies)

Insulation work

  • Insulating the outer surface of basement walls against humidity
  • Heat insulating the pillars and beams comprising the frame using extruded polystyrene foam (XPS). Fibran
  • Anti-seismic joins

Concreting works

  • Top clean layer of concrete on the final excavation level
  • Reinforced concrete floor in the basement and construction of industrial flooring on top of that
  • Payment of concrete workers for:
- Frame
- Visible concreting works
- Parapets, stairs, indents, etc.
  • Payment of ironmonger
  • Payment of concrete supplier for:
- Concrete
- Transportation  
- Liquidifiers
- Pump
  • Payment of iron supplier for:
- all types of steel
- Transportation  
- wire – nails


Your obligations. . . . . Our obligations concerning:

  • the IKA Fund (filling returns and paying for social security contributions)
  • VAT (paying all invoices) up to the minimum cost of building work and
  • keeping them on file at our offices for tax office audits)
  • Cleaning (paying for labour and skips for removing waste)
  • Building site safety measures (fencing off balconies and lift shafts)

PHASE B

from the brickwork to completion of the tiled roof and plasterwork.

This phase includes the following work tasks:

Building work
  • Double row, outer brick walls
  • Single plinth inner brick walls
  • Reinforced wall ties inside and out
  • Construction of fireplace (prefabricated fireplaces are not used)
  • Chimney stack and boiler
  • Levelling the floor – marble window sills
  • Plasterwork indoors, scaffolding for outdoor plasterwork
  • Plasterwork netting indoors and outdoors
Metal work
  • Metal frames for aluminium doors / windows
  • Metal frames for internal doors
  • Lift doors (where there is a lift)
Insulation
  • Application of Fibran heat insulating materials to outer walls
  • Heat insulation of outer ties using Fibran
  • Heat insulation of roof or flat roof-tip using Fibran
  • Waterproofing of balconies
Plumbing work
  • Full water supply network for bathrooms, WCs and kitchen (with copper piping)
  • Full building sewage network (using Petzetakis products)
  • Full rain water protection network (guttering and downpipes) (using Petzetakis products)
  • Water supply and solar water heater on roof
  • Water supply to location of fridge (to produce ice cubes)
Electrical work
  • Installation of high current electrical cabling in building
  • Installation of electrical cabling for alarm, phone, television and doorbell.
Wooden roof
  • Wooden frame for roof (2 or 4 pitches).
  • Anti-fungal timber treatment
  • Terracotta roof tiles
  • Guttering
Your obligations . . . . Our obligations concerning:
  • the IKA Fund (filling returns and paying for social security contributions)
  • VAT (paying all invoices) up to the minimum cost of building work and keeping them on file at our offices for tax office audits)
  • Cleaning (paying for labour and skips for removing waste)

PHASE C

completion of building work - as part of the turn-key solution

This phase includes the following work tasks:

Plumbing work
  • Single pipe central heating system
  • Adjustable network of radiators on each floor
  • Radiator panels
  • Fully fitted boiler room (boiler, burner, expansion chamber, etc.) using a dual-fuel boiler
  • Natural gas network
  • Purchase and installation of sanitary wares and fittings
  • Purchase and installation of sink
  • Purchase and installation of taps for bathroom and kitchen
  • Plumbing certificates (for the planning authorities)
Electrical work
  • Wiring the entire electrical network in the building (weak and
    strong currents)
  • Mains panel
  • Plugs / switches – fuses
  • Electrician’s certificates (for the electricity company)
Metal work – Aluminium
  • Balcony railings
  • Metal storeroom doors
  • Aluminium doors / windows from EUROPA (6000 series with thermal break) white, overlapping + electrically operator shutters + reinforcement, heavy duty aluminium + insect nets + clear double glazed panes 5mm+12 mm +5mm, Energy Efficiency (V = 1.80)
Floors – plaster work – paint work - marble
  • Cement mortar floors throughout,
  • floating, oak pre-polished wooden floor in bedrooms
  • Granite tiles with joins in all other areas, €20/m2(from PORCELANA or KYPRIOTIS)
  • Ceramic tiles in bathrooms at € 25/m2 (from PORCELANA or KYPRIOTIS)
  • California marble on indoor stairs
  • Top quality semi-white Kavala marble thresholds on balcony doors and outdoor stairs
  • Rubbing down internal walls
  • Acrylic paints indoors and outdoors
  • Γύψινες κορνίζες οροφής μέσα
Woodwork
  • 10mm thick wood Kitchen made in Greece
  • Wardrobes Greek-made wardrobes in every bedroom
  • Intenral doors (Greek-made)
  • Reinforced front door from GOLDEN DOOR
Your obligations . . . . Our obligations concerning:
  • the IKA Fund (filling returns and paying for social security contributions)
  • VAT (payment of all invoices up to minimum cost of building work and closure of the dossier at the tax office to obtain power supply)
  • Cleaning (paying for labour and skips for removing waste)
  • Handling of the dossier at the planning office to obtain final power supply for building
  • Handling of the dossier at the natural gas corporation (DEPA) to obtain power supply for building
  • Notification of surface area of building to the local municipality
  • Notification of IKA fund offices about the end of the project and re-checking of detailed IKA fund periodic returns that were filed

PHASE A
From start of work
until completion of building’s frame:……………………………………..……€ 415/m2


PHASES A & B
From start of work
… until completion of tiled roof and plasterwork: …….........…....€ 790/m2

PHASES A, B & C
Construction of home using turn-key method : …….…..….€ 1,150/m2

Newsletter

To receive 3-D mock-ups of our company’s projects and the final cost, please fill out the contact form below.

Tips

Keep the plans and drawings safe…,

The original copy of the building permit and all approved drawings and plans from the building permit dossier should always be kept somewhere safe at home and you should never give them to anyone for any reason. If someone else needs them, give them a photocopy.

Contact Us

313 Irakliou Ave. Neo Iraklio, Attica
Tel.: 210 28.38.071 - 6945.214.210

Contact us now

κατασκευή ιστοσελίδων netstudio